Case Study

Kaiser Permanente

Kaiser Permanente | Denver, Colorado | 2023

105,600
Square Feet
75%
Solar Coverage
15
Days
Project Overview

Re-Roofing a Laboratory Beneath a Solar Array

Replacing a roof is more complicated when most of it is occupied by solar panels and the building below is a laboratory. At Kaiser Permanente’s Denver facility, Strong Contractors coordinated with a solar company to complete the specified TPO roof replacement while protecting the facility and its solar equipment.

The Challenge

With solar panels covering approximately three-quarters of the roof, the re-roofing work depended on close coordination between the roofing and solar teams. The panels needed to be removed without damage, kept safely stored during construction and returned to the completed roof.

At the same time, the laboratory below needed to remain protected from water intrusion throughout the project. The roofing and solar work also had to account for the ballasted array and its footings, walk pads, and project requirements related to Denver’s green roof initiative and LEED.

Aerial view of the Kaiser Permanente laboratory roof and solar arrays before the TPO re-roof

The Specified System

The engineered roof design called for a GAF 115-mil fleece-back TPO layover over mechanically fastened ½-inch DensDeck, with the membrane set in low-rise polyurethane adhesive. The scope also included drainage crickets as needed and work at the metal coping, drains and gutters.

Coordinating the Work

Before roofing could begin, the solar company detached and dismantled the panels and craned them off the roof. The panels were arranged and stored in a conex container according to the manufacturer’s specifications.

Strong’s crew then carried out the roofing work, coordinating with the solar company around the sequence of the project. The scope called for removal of the existing gravel surface and inspection for saturated or defective areas before the new system was installed.

Using specialized equipment and adhesive application techniques, Strong completed the TPO installation in 15 days. The solar company then reinstalled the ballasted array on the completed roof.

Roof boards and TPO installation with crew
Project Documentation

Before and After

Crew preparing the roof surface

Before

The existing gravel roof as the crew begins preparation.
Adhesive beads between TPO sheets

During

Adhesive beads between new TPO sheets.
Finished TPO roof at dusk

After

Finished TPO membrane across the laboratory roof.
Project Video

See the Project

Project Gallery

Kaiser Permanente project photos

Planning a roofing project around rooftop equipment?

Let’s discuss the right roofing approach for your building.

Discuss Your Roofing Project
More Projects

Related Case Studies