Case Study

Pueblo School District 60

Pueblo, Colorado | 2024

SPFA Award Winner
513,800 SF
16 Weeks
Project Overview

SPF Roof Restoration Across Five Schools

Strong Contractors restored roofs across five Pueblo School District 60 schools using a spray polyurethane foam and silicone system. Covering 513,800 square feet over 16 weeks, the project addressed aging roofs with extensive rooftop equipment and asbestos-containing materials.

The Challenge

The existing tar-and-gravel roofs have been modified since 1960s to accommodate HVAC equipment and other building systems. Curbs, pipes, ductwork and conduits crowded the roof surfaces, creating numerous penetrations and transitions that needed to be waterproofed.

A sheet-membrane system would have required extensive cutting and detailing around the equipment. Each connection can be sealed individually, but a large number of seams and connections creates more potential points of failure to manage.

The roofs also contained asbestos. Cutting into or removing asbestos-containing material could disturb it and create an exposure risk, making the restoration approach especially important.

Existing gravel-surfaced built-up roof and rooftop ductwork before the spray foam restoration

The Solution

The district recognized the benefits of a fluid-applied system for roofs with so many penetrations. Strong recommended a Gaco F2780 spray polyurethane foam and S2000 silicone system, finished with No. 6 white granules embedded into the coating.

The spray polyurethane foam (SPF) forms a continuous surface that conforms to the existing roof and its details, eliminating field seams between sheets of membrane. The SPF system also provided an encapsulation approach for the asbestos-containing roofing materials.

Beyond its seamless application, the foam adds insulation, while the silicone coating and white granules protect the system from weather and sunlight.

Pails of Gaco S2000 silicone staged on the new spray foam roof

The Execution

Strong’s roofing crew used the company’s own ballast-removal vacuum and spray-foam equipment to perform the work across the five schools.

The scope began with vacuuming loose gravel and inspecting the existing roof for leaks, saturated areas and defects. Preparation included addressing areas requiring repair, working on drains, scuppers and metal details, and protecting equipment from overspray.

The crew then applied the spray foam and silicone coating, paying careful attention to parapets, curbs and penetrations, and completed the finish with embedded white granules.

Finished spray foam roof beyond a section of existing gravel built-up roof
Project Documentation

Before, During & After

Existing gravel-surfaced built-up roof and rooftop ductwork before the spray foam restoration

Before

Existing gravel-surfaced built-up roof with extensive rooftop ductwork.
Fresh spray foam going down over the existing built-up roof

During

Spray polyurethane foam going down over the existing built-up roof.
Finished spray foam and silicone roof with granules around rooftop conduit

After

Finished spray foam roof with silicone coating and granules.
Project Video

See the Project

Pueblo School District 60: BUR restoration with spray polyurethane foam (SPF) and silicone coating
Matteo and Monika of Strong Contractors holding SPFA award trophies on stage with an Elastochem representative

Award-Winning Work

South Park Elementary

The South Park Elementary portion of the program received recognition in the 2025 SPFA National Industry Excellence Awards:

  • Small Business category: Winner
  • SPF Roof Over 40,000 Square Feet: Runner-up
From the District

“The roofs are performing exceptionally well, and I highly recommend Matteo and Strong Contractors Inc. for any future roofing projects.”

Phil AmaroTrades Foreman, Facilities ManagementPueblo School District 60

The Schools

  • Academy of Arts
  • Corwin International Magnet School
  • Heaton Middle School
  • South Park Elementary
  • South High School
Project Gallery

Pueblo School District 60 project photos

Have a roof with complex equipment, penetrations, or asbestos?

Let’s discuss the right roofing approach for your building.

Discuss Your Roofing Project
More Projects

Related Case Studies