UCHealth Memorial Hospital

UCHealth Memorial Hospital | Colorado Springs, Colorado | 2022

4 weeks
Project duration
964 pavers
Concrete pavers removed by hand
5-minute clearance
To clear the roof for a helicopter
Project Overview

Silicone Roof Restoration Around Emergency Helicopter Operations

Strong Contractors restored 39,600 square feet of roofing at UCHealth Memorial Hospital’s active helipad using a silicone coating system. Completed over four weeks, the project required careful coordination of roofing work, rapid mobilization and demobilization, and removal of 964 concrete pavers from a multi-level roof with limited access.

The Challenge

The hospital’s helipad supported emergency air-ambulance operations throughout the project. Incoming helicopters required the crew to stop work and clear the roof within five minutes, including removing trash and loose materials that could become airborne. Each landing could interrupt work for 45 minutes to an hour before the crew could safely return.

The multi-level roof also contained 964 concrete pavers, each weighing approximately 40 pounds. Limited roof access and ongoing helicopter operations made their removal a significant logistical challenge. All work had to be coordinated around the hospital’s access and security requirements.

Concrete pavers partly removed from the existing hospital roof, exposing the weathered membrane beneath

The Solution

Strong selected a liquid-applied silicone coating system to restore the existing modified-bitumen roof without a full tear-off. The system included a red Gaco bleed-blocking base coat, silicone coating and broadcast No. 11 gray granules.

Because modified bitumen is asphalt-based, oils from the existing roof can migrate into a new coating and cause discoloration. The bleed-blocking base coat helped limit that migration before the silicone was applied. Restoring the roof in place also reduced the disruption, labor and disposal associated with removing the existing system.

Close-up of the granule-surfaced silicone coating

The Execution

Strong coordinated directly with hospital security using two-way radios to receive notice of incoming helicopters. The crew organized its work to stop, secure the area and clear the roof quickly, then return and resume work when permitted.

The pavers were removed by hand and transported from the multi-level roof through the hospital. The process involved hoisting, dolly transport, service-elevator coordination, palletizing and flatbed removal, all within the hospital’s access and badging requirements.

The crew applied the red Gaco bleed-blocking base coat over the prepared roof, followed by the silicone coating and broadcast No. 11 gray granules. Job hazard analyses, regular toolbox talks and third-party safety monitoring supported the work.

Crew working on the red base coat beside the finished light gray top coat on the hospital roof
Project Documentation

Before, During and After

Concrete pavers partly removed from the existing hospital roof, exposing the weathered membrane beneath

Before

Concrete pavers partly removed from the existing hospital roof.
Gray silicone top coat going over the red base coat

During

Gray silicone top coat going over the red base coat.
Finished granule-surfaced silicone coating beside the hospital tower

After

Finished silicone coating with broadcast granules.
Project Video

See the Project

Project Gallery

UCHealth Memorial Hospital project photos

From the Project Manager

“Strong Contractors leadership is high performing, hard working, detailed oriented and committed to providing an excellent product. Their leadership qualities are portrayed throughout their entire team. They have some of the hardest working employees I have ever worked with.”

Erin SweeneyProject ManagerMemorial Hospital Center, UC Health